Erection of steel columns at sequence 1 (N.E. corner of building).

Erection of Steel at sequence 1 (N.E. corner of building).

Steel installation at the 2nd floor of sequence 1 (N.E. corner of building).

Preparing for beam-to-column connection at the 2nd floor of sequence 1 (N.E. corner of building).

View looking Southwest at sequence 1 (N.E. corner of building.

Grade Beams and pile caps along column line E.5 at the loading dock.

Reinforcing steel installation at foundation wall along column line C.

Grade Beams and pile caps along column line 6 at the corner of the loading dock.