Library shelving at the 1st floor.

Door and hardware installation at the 1st floor.

Ceiling tile installation at the 1st floor.

Wainscot at the 2nd floor Servery.

Audio/Visual closets at the Heritage Room.

Carpet tile installation at the 3rd floor.

Carpet tile installation at the 3rd floor.

Acoustical panel ceiling grid at the 4th floor.

Curtainwall installation at the 4th floor (Atrium area).

Sadler tile installation at the Community Room.

Acoustical panel ceiling grid at the 2nd floor.