
East elevation of the building structure.

North elevation of the building structure.

New building structure in relation to existing Student Union on the right and Chapel on the left.

North and East elevations of the building structure.

Roof framing over east elevator.

Typical moment connection.

View looking at east side of building.

Wall along column line A at the north side of the Community Room.

Pad footings at the 2nd floor main entrance.

View looking south on the 2nd floor.

Underslab plumbing at the 1st floor Cafe.

Power and data conduits to floor boxes at the 2nd floor.
Return to Construction Updates Index Page.