Underslab plumbing for the 1st floor restrooms.

Footing excavation at the Chiller slab area.

View looking north on the 3rd floor.

Footings along the north side of the Community Room .

1st floor slab-on-grade preparation at the south side.

1st floor slab-on-grade preparation at the east side.

Floor box rough-in at the 1st floor east side.

View of loading dock wall.