1st floor slab on grade prep work.

View of Community Room at the north side of the building.

2nd floor main entrance at the north end.

Mechanical duct hangers and wall layout at the 1st floor.

Overhead conduit rough-ins and duct hangers at the 1st floor.

2nd floor slab on deck prep work at the west side.

Construction of masonry wall at the west side of the ASRS.

Installation of curbs at the perimeter of the 3rd floor mechanical room.

Masonry wall and steel at the west side of the 3rd floor mechanical room.

View of west elevation.

Roof membrane installation.

Roof membrane installation.