Fireproofing on structural steel at the southwest stairtower.

Sprinkler piping overhead rough-ins at the 1st floor.

Overhead rough-ins at the 1st floor.

Overhead rough-ins at the 1st floor.

Duct installation at the 1st floor south of the ASRS area.

MEP hanger installatios, F.A. and lighting rough-ins at the 2nd floor.

Fireproofing of structural steel at the 2nd floor west elevation.

View looking the chiller slab area.

F.A. and lighting rough-inst at the 2nd floor.

View looking west into the 3rd floor mechanical room.

View of the 4th floor terrace.

Installation of roof drain piping.

View looking west at the roof.

Installation of AHU#1 at the north side of the 3rd floor mechanical room.

Lifting a section of AHU#1 into the 3rd floor mechanical room.