Exterior wall framing at the southwest stairtower.

Exterior wall framing at the southwest stairtower.

Interior wall framing at the 1st floor.

Interior wall framing at the 1st floor.

Masonry wall installation at the 1st floor north of the loading dock wall.

Installation of main electrical gear at the 1st floor.

Delivery of one of the ASRS cranes.

Ductwork installation at the 2nd floor.

Fireproofing at the 3rd floor.

View overlooking the chiller slab area.

View of the 4th floor terrace.

Removal of the cantilevered slab shoring.

Overhead rough-ins at the 1st floor.

Footing installation for the east exterior stair.