Exterior sheathing and tyvek installation at the southwest stairtower.

Exterior sheathing and tyvek installation at the southwest stairtower.

View looking north at the loading dock area.

Forming of the west wall of the east exterior stair.

Overhead rough-ins at the 1st floor.

Slab prep work at the Community Room.

Ductwork installation at the 2nd floor.

Ductwork and sprinkler piping rough-ins at the 2nd floor.

Roof drain piping, gas piping and hanger installations at the 4th floor.