Christopher Center for Library and Information Resources: Construction Photos: July 10, 2003


View of the southwest stairtower and exterior walls at the west elevation.


Brick installation at the southwest stairtower.


Brick installation at the southwest stairtower.


Exterior framing, sheathing and tyveking at the east elevation.


Interior wall framing at the 2nd floor.


Overhead rough-ins of water mains and duct at the 2nd floor.


Wall framing at the 2nd floor Men’s and Women’s restroom.


In-wall plumbing rough-in at the 2nd floor restrooms.


3rd floor main electrical room.


4th floor main electrical room.


VAV box installations at the 4th floor.


Retaining wall footing at the west side of the loading dock.


Return to Construction Updates Index Page.




ValpoAdditions and corrections for this page may be directed to Web.Coordinator@valpo.edu
Copyright © 1995 - 2003 Valparaiso University. All Rights Reserved.
This page was last updated 7/21/03 9:38:28 AM CT