Insulation installation at the core pipe of the HTHW system.

Curb installation at the West side of the Student Union.

Sidewalk repairs at the entrance drive into the existing Union.

Telecommunication ductbank installation at the West side of Christ College.

Conduit installation for the (2) High Voltage lines at the West side of Kretzmann Hall.

Relocated condensing units at the North side of the Union.

New sanitary manhole at the North end of the site.

Stubs ups for water and sanitary lines at the North end of the site.