VALPOIndex | Contact
Home : Christopher Center : Construction Photos : September 3, 2003
CLIR Home Page Model Views Architect's Drawings Floor Plans shape= Groundbreaking Construction Photos WebCam

Christopher Center for Library and Information Resources: Construction Photos: September 3, 2003


View of the curtainwall at the east elevation.


View of the curtainwall at the south elevation.


Curtainwall framing at the west elevation.


Brick installation at the northwest corner of the Community Room.


Brick installation at the northeast corner of the Heritage Room.


View of the north and west elevation of the Mechanical Room.


Exterior framing and sheating at the north elevation over the Community Room and Skylight.


3rd floor Mechanical Room plenum.


Fan installation at the 3rd floor Mechanical Room plenum.


Backflow preventer installation at the 1st floor Mechanical Room.


Stair #2 installation at the southwest stair tower.


Bulkhead framing at the 3rd floor.


View from the 2nd floor overlooking the 1st floor stack area.


Interior wall framing at the 3rd floor.


VFD installation at AHU#2.


Interior wall framing at the 4th floor.


Chilled water pump and piping installation at the 3rd floor Mechanical Room.


Duct installation at main vertical chase for AHU#2.


Return to Construction Updates Index Page.




ValpoAdditions and corrections for this page may be directed to Web.Coordinator@valpo.edu
Copyright © 1995 - 2003 Valparaiso University. All Rights Reserved.
This page was last updated 9/9/03 11:59:17 AM CT