Precast sunshade steel erection at the south elevation.

Zinc panel installation at the south elevation of the Mechanical Room.

Brick installation at the 2nd floor Reading Room.

2nd floor drywall installation.

2nd floor drywall installation at the training room.

View looking west at the 3rd floor Mechanical Room plenum / louvers.

Site grading / landscape prep along the main road.

Window frame and glass installation at the Heritage Room.

View from north (taken 10/20/03).