Installation of cable tray and unistrut at basement of Guild Hall.

Installation of H.V. ductbank at the Northeast side of the construction site.

Pad installation medium voltage switchgear.

Excavation at ASRS.

Grade beam and pile cap excavation at column line 2 between A & C.

Grade beam excavation and forming along column line ‘C’.

Pile cap and grade beam excavation along column line ‘C’.