Asphalt binder coarse installation at the parking lot.

View of the parking lot from the roof.

Asphalt binder coarse and sidewalk installations along the main entrance road.

View of the precast sunshade at the S.E. corner of the building.

Precast cladding at the east elevation.

Precast purlins over the 4th floor terrace.

1st floor bulkhead framing.

Fire door installation at the 2nd floor Reading Room.

Soffit framing at the 2nd floor main entrance.

3rd floor bulkhead drywall installation.

2-story curtainwall framing and glazing installation at the north elevation.

Drywall installation at the 4th floor Study Rooms.