Steel columns at the Northeast corner of the building.

Steel columns at the Southwest corner of the building.

Steel columns, wall reinforcing steel, grade beams and pile caps along column line 6.

Installation of Loading dock road sub-base.

Wall framing along column line C.

Backfilling pile caps and grade beams along column line 2.

Grade beam near the Northeast elevator pit.

Backfill at an interior pile cap.

Junction box at exterior of Kretzmann Hall.

Sump Basin at the ASRS area.

1-1/2" gas line tap at the Southwest corner of Kretzmann Hall.

4" gas line tap at the South end of the loading dock.