Christopher Center for Library and Information Resources: Construction Photos: December 5, 2003


Ceiling grid installation at the 1st floor.


Ceiling grid installation at the 1st floor.


Zinc panels at the loading dock canopy.


Site wall masonry at the loading dock.


Shade bulkhead framing and linear diffuser installation at the 2nd floor Heritage Room.


Duct installation at the Community Room.


View from the Community Room looking east towards the 2nd floor main entrance.


2nd floor main entrance.


Wall framing and insulation at the Classroom and Projection Room of the Community Room.


Site wall masonry at the planter wall north of the Community Room.


Final painting of the 3rd floor bulkheads.


Bulkhead drywall installation and finishing at the 4th floor.


Return to Construction Updates Index Page.




ValpoAdditions and corrections for this page may be directed to Web.Coordinator@valpo.edu
Copyright © 1995 - 2003 Valparaiso University. All Rights Reserved.
This page was last updated 12/10/2003 2:27:13 PM CT