Ceiling grid installation at the 1st floor.

Ceiling grid installation at the 1st floor.

Zinc panels at the loading dock canopy.

Site wall masonry at the loading dock.

Shade bulkhead framing and linear diffuser installation at the 2nd floor Heritage Room.

Duct installation at the Community Room.

View from the Community Room looking east towards the 2nd floor main entrance.

2nd floor main entrance.

Wall framing and insulation at the Classroom and Projection Room of the Community Room.

Site wall masonry at the planter wall north of the Community Room.

Final painting of the 3rd floor bulkheads.

Bulkhead drywall installation and finishing at the 4th floor.