Concrete shear wall at line G and foundation wall at line C.

Construction of concrete shear walls at the Southwest stair tower.

Concrete shear walls at the Southwest stair tower.

10” and 4” storm piping at the Southwest stair tower.

Backfill at pile caps, grade beams and elevator pit at Northeast corner of building.

Foundation wall along column lines ‘C,’ ‘2’ and ‘B.’

North side of foundation wall along column line ‘C.’

Medium-voltage cable splice at electrical vault.