
View overlooking the ASRS area.

Installation of pile caps and grade beams along the South side of the ASRS area.

Grade beam and pile cap forming along column line M near the Southwest stair tower.

Interior pile caps along column line 4.

Preparation of medium voltage cable for the Hi-Pot test.
Return to Construction Updates Index Page.