Requirements:
- Media: Heavy-duty gel-filled armored cabling (see VU Approved Parts List). Capacity specified on per building basis.
- Termination: Cabling must be terminated in 3M Series 4188 (see VU Approved Parts List)
- Labeling/Documentation: Clearly label and document (including cable route) all cable installations. Obtain cable number and labelling standard from EIS.
- Installation: Installation by BiCSi Certified Installer Only. Manhole-splicing should be avoided. All copper installations must have arresters (see VU Approved Parts List) at building entrance.
- Verification: Cabling must be tested for continuity and polarity. Installed cable must be tested for and meet or exceed Nortel Digital resistance and attenuation requirements.
Back to Inter-Building Telecommunications
Written by: Mike Tucker, Simon Kissler, Mike Schwinn (NS); Dwight Batey, Justin Hunt (TEL); May 14, 2001
Approved by: ;
Reviewed by: ;
Revised by: Mike Tucker, Simon Kissler; December 13, 2002
Revised by: Mike Tucker, Simon Kissler, Mike Schwinn; May 21, 2003
Revised by: Mike Tucker, Mike Rabe, Simon Kissler, Mike Schwinn; January 8, 2005
Revised by: Mike Tucker, Mike Rabe, Simon Kissler, Mike Schwinn; March 14, 2006