Water and Sewer Project

New water and sewer mains have been installed at numerous campus locations, both to create capacity for addition of the new union and to replace deteriorating 50-year old lines. The path of these mains affected several campus locations and required excavation for new pipe, entrance and exit areas for underground boring, next to campus buildings to connect the new lines to them and creation of new manholes. In some instances, the new water lines increase the water flow capacity that could be important in case of a fire. The lines also will aid in the handling of storm water after sudden downpours.